You don't have javascript enabled. Good luck with that.
Pencarian
Enam Eskavator Dikerahkan Keruk Kali Pakin

Pakin River at Pasar Ikan Normalized

Six amphibian excavators were deployed to normalize Pakin river, RW 04, Penjaringan, North Jakarta. Normalization was held after demolition of buildings on Monday (4/11) ago.

Sheet pile will be installed after the dredging is completed

Based on Beritajakarta.com’s observation, the heavy equipment dredged the river from mud as well as widened the river.

Suranta, Penjaringan Urban Village Head, admitted Jakarta Dept. of Water Management directly dredged the river after the buildings demolition was completed. The river is deepened up to four meters and widened by 12 meters.

Connecting Channel in Rawa Bilal Dredged

“Sheet pile will be installed after the dredging is completed,” he said.

Linked News
Popular News indeks
  1. 21 Parking Spots to Make Your Jakarta 499th Anniversary Experience Seamless

    access_time26-06-2026 remove_red_eye935 personAldi Geri Lumban Tobing
  2. Over 11 Kilometers of Overhead Utility Cables Removed in West Jakarta

    access_time26-06-2026 remove_red_eye886 personBudhi Firmansyah Surapati
  3. Celebrating Jakarta`s 499th Anniversary at HI, Please Use Public Transportation

    access_time26-06-2026 remove_red_eye748 personAldi Geri Lumban Tobing
  4. 190 Satpol PP Personnel Deployed to Secure Jakarta Anniversary Celebration

    access_time26-06-2026 remove_red_eye713 personFolmer
  5. Night at The Library Marks Jakarta's 499th Anniversary with Five-Century Message

    access_time27-06-2026 remove_red_eye693 personAnita Karyati