You don't have javascript enabled. Good luck with that.
Pencarian
Enam Eskavator Dikerahkan Keruk Kali Pakin

Pakin River at Pasar Ikan Normalized

Six amphibian excavators were deployed to normalize Pakin river, RW 04, Penjaringan, North Jakarta. Normalization was held after demolition of buildings on Monday (4/11) ago.

Sheet pile will be installed after the dredging is completed

Based on Beritajakarta.com’s observation, the heavy equipment dredged the river from mud as well as widened the river.

Suranta, Penjaringan Urban Village Head, admitted Jakarta Dept. of Water Management directly dredged the river after the buildings demolition was completed. The river is deepened up to four meters and widened by 12 meters.

Connecting Channel in Rawa Bilal Dredged

“Sheet pile will be installed after the dredging is completed,” he said.

Linked News
Popular News indeks
  1. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye772 personAldi Geri Lumban Tobing
  2. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye760 personBudhi Firmansyah Surapati
  3. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye672 personDessy Suciati
  4. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye645 personAldi Geri Lumban Tobing
  5. Transjakarta Commits to Transport Equality Across the Seribu Islands

    access_time24-08-2026 remove_red_eye643 personAldi Geri Lumban Tobing